November 1, 2024
6 min read

FedSubK Feature: What To Know Before You Say Go (or No-Go)

FedSubK Features
Contracting Basics
FedSubK Features
Contracting Basics

The day has come…the Request for Proposal (RFP) you’ve been watching and waiting for has gone “live.” Your team has made a tentative decision that it wants to submit a proposal for this project. You download the solicitation documents and start looking through the requirements. Contract type, type of work, is subcontracting or limitations in subcontracting required, terms, conditions, pricing…you run down all the key pieces of information that you need to form your risk tolerance decision for the work. But, there are some other key pieces of information that, from a former Contracting Officer and Source Selection Authority’s perspective, to also keep in mind as you make your final “go/no-go” decision to propose and develop your proposal.

Know the Rules for Government Exchanges with Industry Before Receipt of Proposals (FAR Subpart 15.201)

Exchanges of information between the Government and Industry are encouraged. However, any exchange must be consistent with the procurement integrity requirements of FAR Subpart 3.104. This includes not only exchanges but also disclosure, protection, and marking of contractor proposal information and source selection information.

Requests for Information (RFIs) and Draft RFPs for industry input are considered part of the market research process under acquisition planning. These methods are not required but when used allow for more open exchanges between the Government and Industry. Potential offerors can share information to influence the Government’s procurement strategy (but mark anything proprietary accordingly). The Government may also hold conferences or meetings for the purpose of obtaining industry input. Recently one agency did an oral RFI exchange with industry and I was skeptical of how it would go but was pleasantly surprised at how Government posed the questions live and how industry responded (or didn’t when the line that led to exchange of proprietary info was near crossing). (See even an old dog can learn new tricks!)

Exchanges after issuance of the solicitation but before receipt of proposals are used by the Government to improve potential offerors’ understanding of requirements and allow them the chance to determine their ability to meet those requirements. These exchanges often take the form of questions from industry on RFP documents, answers in response from the Government, and pre-proposal conferences. The Contracting Officer oversees and controls these exchanges. If you get information from another source—a team member or someone other than the Contracting Officer—proceed with caution and verify, verify, verify.

Watch for Amendments! (FAR Subpart 15.206)

Changes to the RFP documents are made by formal amendment to the solicitation before the established time and date for receipt of proposals. Amendments must provide sufficient time for potential offerors to digest changes and update proposals. Each amendment will also be announced with its own notice and published in the Government Point of Entry (GPE), typically SAM, GSA eBuy, or other agency portal used to publicize opportunities. Amendment notices will outline the changes made. An oral notice may also be used when time is of the essence, such as the case may be in a contingency or emergency environment, which is then formalized by a written amendment issued by the Contracting Officer.

More often than not, the Government provides answers to RFP questions that may or may not be material in nature or result in an amendment. The Government doesn't always tell you if an amendment is forthcoming either. If in doubt, ASK. Don't wait for an amendment and then ask for a proposal extension later; not likely to happen. Instead put it in your rhythm to ASK questions like this as soon as they come up. Don't make assumptions!

Amendments can also be issued after the close of receipt of offers/proposals. However, if the Contracting Officer determines that such an amendment “...is so substantial as to exceed what prospective offerors reasonably could have anticipated so that additional sources likely would have submitted offers had the substance of the amendment been known to them”, the Contracting Officer must cancel the original solicitation and issue a new one, regardless of the stage of the acquisition.

The worst possible thing is to finish an offer/proposal and realize too late that you haven’t taken an amendment into account. Failure to acknowledge an amendment is grounds to eliminate your proposal from consideration right out of the gate!

Understand the Basics of Different Source Selection Techniques (FAR Subpart 15.1)

Techniques for the selection of sources under competitive procurements fall within a range called the Best Value Continuum. This range equates to the Government’s perceived risk of unsuccessful performance which is then translated into the prioritization of technical factors and cost or price factors and their individual and collective importance.

An agency may use only one or a combination of the Tradeoff Process and the Lowest Price Technically Acceptable Process to arrive at the determination of the best value for the Government. The characteristics of each are found in the table below.

Tradeoff Process

Lowest Price Technically Acceptable Process

Allows selection of other than the lowest-priced or highest technically rated offeror using tradeoffs between technical superiority and cost or price, as described in the solicitation.

Requires selection of the technically acceptable proposal with the lowest evaluated price

The technical factors and significant subfactors that affect contract award and their relative importance are disclosed in the RFP.

The RFP also includes a statement whether all evaluation factor factors other than cost or price (aka “technical factors” when combined, are–

  • Significantly more important than cost or price,
  • Approximately equal to cost or price, or
  • Significantly less important than cost or price.

Technical factors are not ranked by relative importance.

Failure of a proposal to meet the minimum technical acceptability standard of any technical factor or subfactor automatically eliminates the proposal from further consideration.

Past performance is a required evaluation factor.

Past performance is not a required evaluation factor.

Factors and significant subfactors establish a list of criteria describing required or desired skills and experience against which the proposal is subjectively evaluated.

Factors and significant subfactors establish objective thresholds of technical acceptability (measures) against which the proposal is evaluated.

Technical ratings are subjective and use a rating scale of adjectival descriptors, colors, numerical weights, or original rankings. Cost or Price is evaluated, not rated.

Technical ratings are objective and use a go/no-go, pass/fail, or acceptable/unacceptable scale. Cost or Price is evaluated, not rated.

Provides the greatest flexibility for the Government to achieve the best balance of technical and cost/price acceptability.

Provides the ability to achieve a minimum technical acceptability level on all technical factors and significant subfactors and achieve the lowest evaluated price.

Any perceived benefits of a higher-priced proposal require supporting documentation to quantify the payment of any additional cost in terms of specific benefits to the Government.

Only the lowest-priced proposal of the proposals found to be technically acceptable is considered for award.

The point-by-point tradeoff decision is documented and reviewed as required by FAR, any agency FAR supplement, and agency policy.

Tradeoffs are not allowed.

Award Without Discussions or Competitive Range? (FAR Subpart 15.306(c))

The Government has a choice. It can choose to make a contract award decision based solely on initial proposals and not engage with offerors, or it can establish a competitive range to conduct discussions (aka, negotiations) before an award is made.

What’s a competitive range? Based on the ratings of each proposal against all evaluation criteria, the Contracting Officer will establish a competitive range comprised of all of the most highly rated proposals; those most likely to receive the contract award. It’s a down-selection. The competitive range can be further reduced for purposes of efficiency when documented with the rationale why and the solicitation so states.

The solicitation will disclose the Government’s choice. This choice is important. An award without discussions means you get one shot – the first shot – to get your proposal right. There are no fixes or changes allowed later. However, even when the Government chooses “award without discussions,” it always reserves the right to open discussions with offerors if it is in the Government’s best interest to do so. But don’t rely on it happening. If the Government can avoid discussions before the award, it will; trust me on that. It saves weeks of work and documentation when discussions are avoided. Write your best offer/proposal the first time!

When developing your go / no-go decision matrix, add these elements. Depending on your current risk tolerance, you’ll feel more confident that you’ve covered the bases procedurally as well as technically when making that important decision about expending resources for offer / proposal development.

Tags:

Share this post
FedSubK Features
Contracting Basics
Shauna Weatherly

View related posts

March 11, 2025

DoD Reduction In Force (RIF) Guidance

Just when you thought it couldn't get any more confusing, some agencies also have their own RIF guidance separate from the OPM guidance that is what we've heard the most about. DoD is one of those agencies.

A copy of the current DoD RIF guidance, DoD Instruction 1400.25, Volume 351, is found at: https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/140025/140025_V351.PDF?ver=DgEFMmb9dLDV7OV-PLb7VQ%3D%3D

This guide establishes policy, assigns responsibilities, and prescribes procedures for reduction in force (RIF) actions taken under Part 351 of Title 5, Code of Federal Regulations (CFR), as modified by Section 1597(f) of Title 10, United States Code (U.S.C.).

This guidance does not, in full, apply to DoD employees covered by an alternative personnel system (e.g., the Acquisition Demonstration; Science and Technology Reinvention Laboratories; and the Defense Civilian Intelligence Personnel System). Those systems will develop their own policies and procedures for RIF that comply with the law, as approved by the Under Secretary of Defense for Personnel and Readiness (USD(P&R)). This guide also does not apply to Senior Executive Service (SES) positions.

The policy statement in 1.2 states that, "For any RIF of civilians in the competitive and excepted services in the DoD, the determination as to which employees will be separated from employment must be made primarily on the basis of performance."

In accordance with 10 U.S.C. 1597, DoD must report to Congress 45 days prior to implementing an approved RIF.

DoD will comply with 5 CFR 351.402 and 351.403 when establishing competitive areas and competitive levels, respectively. Competitive service employees and excepted service employees are placed on separate retention registers established in accordance with 5 CFR 351.404 and 351.405.

For purposes of DoD RIF, employees are placed in one of two categories:

  • employees with a period of assessed performance of less than 12 months, and
  • employees with a period of assessed performance of 12 months or more.

An employee’s period of assessed performance for purposes of RIF will be the sum of the months of assessed performance associated with the employee’s performance appraisals within the most recent 4-year period preceding the cutoff date established for the RIF. However, periods of time in a rating cycle for which an employee’s performance was not assessed are not included in the employee’s period of assessed performance.

For example, if an employee receives a rating after serving 10 months of the 12-month cycle, the employee’s period of assessed performance is 10 months for that rating cycle.

For employees absent for military service, periods of time during the rating period may be treated as periods of assessed performance if they meet the requirements of Paragraph 3.3.c.(1) under Paragraph 3.3.b.(2) of the DoD guide.

Retention Factors

Competing employees are listed on a retention register based on--

  • Rating of Record. See Section 3.3.c. for rating of record examples based on cutoff dates, military service, time frames for ratings to be used, and ratings from a system other and the Defense Performance Management Program (DPMAP).
  • Tenure Group. This follows the definitions found in 5 CFR 351.501(b) for competitive service and 5 CFR 351.502(b) for excepted service.
  • Average Score. In general, an employee’s average score for one performance appraisal is derived by dividing the sum of the employee’s performance element ratings by the number of performance elements. The average of the average scores drawn from the two most recent performance appraisals received by the employee, except when the performance appraisal reflects an “unacceptable” rating of record will be reviewed. When the most recent performance appraisal reflects an “unacceptable” rating of record, only that performance appraisal will be considered for purposes of the employee’s average score.
  • Veterans’ Preference. This follows the procedures in 5 CFR 351.501(c) with three veterans' preference subgroups:
    • AD - 30% or more disabled veteran
    • A - eligible for veterans' preference for the purpose of RIF but not for placement in the AD category (i.e., less than 30% disabled veteran determination)
    • B - not eligible for veterans' preference for purpose of RIF
  • DoD Service Computation Date-Reduction in Force (DoD SCD-RIF). Follows rules of credible service as found in 5 CFR 351.503(a) and (b). DoD does not follow 5 CFR 351.504, which grants additional retention service credit in RIF based on an employee's ratings of record.

Rounds in Reduction in Force (RIF)

Two rounds of RIF will be conducted. Round One, Release from Competitive Level, and Round Two, Assignment Rights, are explained in the document in detail related to types of appointments, order of release from the competitive level, and exceptions that may apply. They are found in sections 3.5 and 3.6, respectively.

Displacement may occur during Round Two. Displacement is the assignment of an employee to a continuing position in a different competitive level that is held by another employee with a lower retention standing (i.e., “bumping” another employee). Displacement may be at the same grade or at a grade up to three grades or grade intervals (or equivalent) below the position of the released employee.

Right of Only One Offer

Employees released from a retention register are only eligible for one offer of assignment (similar to OPM rules), with some exceptions. If the employee accepts and offer, rejects an offer, or fails to reply to an offer in a timely manner, they are not entitled to further offers. However, the DoD Component must make a better offer of assignment to a released employee (i.e., to a position with a higher representative rate) if a position becomes available before, or on, the RIF effective date.

Sample retention registers and scenarios are found in the guide in Appendix 3A. Employees have the right to request a review of retention registers and have representation also be allowed to review the registers, as requested by the employee.

--------------------------------------------------------------------

DISCLAIMER: Info is provided for awareness. I am NOT an HR professional but an HR enthusiast having started in HR and being a Federal supervisor and hiring manager. Before taking any action that changes your status, please seek the advice of an attorney knowledgeable in Federal employment law.

Fed Forward
DoD News
March 10, 2025

Voluntary Separation Incentive Payment (VSIP)

Voluntary Separation Incentive Payment (VSIP) allows agencies that are downsizing or restructuring to offer employees lump-sum payments up to $25,000 as an incentive to voluntarily separate. The amount received is reduced by Fed and state taxes, social security, and Medicare, as applicable.

The full guide on the program is found at the OPM website https://www.opm.gov/policy-data-oversight/workforce-restructuring/voluntary-separation-incentive-payments/guide.pdf

Eligibility for VSIP requires an employee be employed by an Executive Branch agency for at least three (3) continous years without a time limit and not be--

▶️ a reemployed annuitant;

▶️ otherwise be eligible for disability retirement;

▶️ recipient of a notice of involuntary separation for misconduct or poor performance;

▶️ recipient of any previous VSIP from the Federal Government;

▶️ on a service agreement for which--

➡️ a student loan repayment benefit was paid, or is to be paid, during the 36-months preceding the date of separation;

➡️ a recruitment or relocation incentive was paid, or is to be paid, during the 24-months preceding the date of separation; and

➡️ a retention incentive was paid, or is to be paid, during the 12-months preceding the date of separation.

If you receive a VSIP and later come back to Federal Service within 5 years of the date of the separation on which the VSIP is based, you must repay the entire amount before your first day of reemployment. This includes working under a personal services contract or other direct contract with the Government.

The top 10 questions related to VSIP can be found at https://www.opm.gov/policy-data-oversight/workforce-restructuring/voluntary-early-retirement-authority/top-10-frequently-asked-questions-about-vera-and-vsip.pdf

OPM's page on VSIP is at https://www.opm.gov/policy-data-oversight/workforce-restructuring/voluntary-separation-incentive-payments/

DISCLAIMER: Information is provided for situational awareness. I am not an HR professional but an HR enthusiast having been a Chief of Contracting and Federal supervisor. Please consult with an attorney knowledgeable in Federal employment law before making any decisions that impact your Federal employment status.

Fed Forward
March 10, 2025

Separate Your Government and Personal Communications

Feds...if you haven't separated your Government communications from your personal communications yet, now is the time to do it.

There has never been an expectation of privacy while using Government Furnished Equipment (GFE). But GFE has been allowed to be used for quick personal calls or emails to check in with children or with family members during the work day. And over time, you may have blended your Government and personal communications more than you realize.

Now, however, it appears your every digital and possibly physical move may be tracked, recorded, and stored. Software and hardware that tracks employee activity, digital behavior, and even movements within Government office space should be expected. Tracking software has (allegedly) already been pushed at some agencies or is (allegedly) expected to be pushed soon.

Computer monitoring programs are expected to track:

🔸️Key stroke loggers to record what is typed or edited

🔸️Analyze chats for flagged words

🔸️Network activity, file access, login, and online behaviors

🔸️Application usage and websites visited and what was searched

Expect software applications to be employed that will analyze this information and generate behavior risk scores by employee. Also expect that all online meetings and chats will be recorded, transcribed, and stored / archived for review without the choice to turn those features off.

Several employees at one prominent agency are reporting their GFE laptop cameras and possibly mics are being turned on during their work day without their consent and outside of active video meetings.

Highly suggest --

▶️ using a privacy cover for your webcam.

▶️ monitoring the activation light.

▶️ taking all personal calls away from your work space on a personal device.

▶️ taking other precautions to protect sensitive conversations, business and personal such as only using a personal device.

Fed Forward

Stay Updated, Stay Ahead

Get timely, actionable insights delivered straight to your inbox.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.